youfa steel pipe group
Customer First,Integrity First
Home / All / Scaffolding / scaffolding steel pipe /

YOUFA factory BS1387 hot dipped galvanized scaffolding pipe 48.6mm steel pipe

YOUFA factory BS1387 hot dipped galvanized scaffolding pipe 48.6mm steel pipe

YOUFA factory BS1387 hot dipped galvanized scaffolding pipe 48.6mm steel pipe
YOUFA factory BS1387 hot dipped galvanized scaffolding pipe 48.6mm steel pipeYOUFA factory BS1387 hot dipped galvanized scaffolding pipe 48.6mm steel pipeYOUFA factory BS1387 hot dipped galvanized scaffolding pipe 48.6mm steel pipeYOUFA factory BS1387 hot dipped galvanized scaffolding pipe 48.6mm steel pipe
Categoriesscaffolding steel pipe
BrandYoufa
Unit PriceUS $ 600-750 / ton
FOB portxingang,tianjin
Terms of PaymentL/C, T/T
Update TimeOct 9,2024
Detail Information
YOUFA factory BS1387 hot dipped galvanized scaffolding pipe 48.6mm steel pipe

Specification :

Products Show

Galvanized steel pipe Usage:

 

Delivery Steel Pipe: Low pressure liquid / water / gas / oil / line pipe,

                                 Fire sprinkler steel pipe,

 

Structure Steel Pipe: Construction / building materials steel pipe,

                                  Scaffolding pipe,

                                  Solar structure component steel pipe

                                  Fence post steel pipe

                                  Greenhouse frame steel pipe

Packing:
Main product:

Youfa  Advantage

1. 100% after-sales quality and quantity assurance.

2. Professional sales manager quick reply within 24 hours.

3. Large Stock for regular sizes.

4. Strong produce capability and capital flow.

Other related Products:

Company Information:

Exibition:

Certifications & Testing:    

FAQ 

1.Q:Are you a factory or trading company? 
We are factory and China Top 500 Enterprise

2.Q:Where is your factory located? How can I visit there? 
We locate in Tianjin, China, 30 minutes from Beijing by train.

3.Q:Can I get some samples? 
Yes,free samples can be provided

4.Q:What do your factory do regarding quality control? 
From material to produts, we inspect each process to keep good quality.
And BV/SGS inspection can be accepted.

5.Q:How about MOQ ? 
We have stock of common sizes at hand, so one ton is accepted.

6.Q:How about payment ? 
Both T/T and L/C can be accepted.

7.Q: How long does your warranty? 
We can assured the quality within 90 days after receiving the cargoes.

Please send your message to us
We will get you a fast free quote and schedule your job on the day and time that works best for you.
*Email
*Name
*Tel
*Title
*Content
Upload
  • Only supports .rar/.zip/.jpg/.png/.gif/.doc/.xls/.pdf, maximum 20MB.
*Address
subscription
Sign up for our newsletter to stay up-to-date with our promotions, discounts, sales, and special offers.